"Making an Entrance"
Home > Axis Hub > Case Studies > Harrogate District NHS Foundation Trust
Flo-Motion Clear Opening Calculator

1st March 2024

Harrogate District NHS Foundation Trust

Industry: 

Healthcare

Client: 

Harrogate District NHS Foundation Trust

Contactor: 

Whitaker & Leach

Project:

The refurbishment and expansion of the Wensleydale Ward at Harrogate District Hospital, to enable the creation of a new dedicated cardiology and respiratory ward. Our brief for the project was to design, supply and fit the doors for the project.

Challenges:

The main challenges for this project included: space-saving, to maximise usable areas for staff and patients; the adaptability of the doors to be able to easily flip between providing excellent two-way visibility for staff and patients and providing privacy, when required; and the ease of operation to assist staff in a busy environment.

Solution:

Working with the architects and contractor, the solution specified was seven door-sets from our award-winning Flo-Motion Manual Sliding Doors range. These included 4 or our Flo-Motion® F11 door type and 3 of our Flo-Motion® F12 door type – all glazed, and with manually operated interstitial blinds. 

Contrasting two-colour powder finishes were applied with RAL 7037 satin used for frames and fixed panels, and RAL 7038 satin used for sliding doors with the handles in stainless steel.

Outcome:

 Our Flo-Motion® door-sets provide several significant benefits for patients and staff, which include: 

Posted in: Healthcare | Flo-motion


Ready to talk to us about your project?

Book a meeting with our Sales Manager, Sam Wallace.

Book a meeting
Back to Axis Hub